What are you working on?



Show first post

414 replies

Userlevel 2
Badge +2
Building a management infrastructure using Nutanix VMs for File-as-a-service offering.
Badge
Currently working to upgrade our cluster to AOS 5.10.3.1 and upgrade HBA firmware via LCM!
I'm currently working on building a home lab using Nutanix for more hands on experience.
We are still trying to fine tune our new Nutanix environment
Badge
Finally moving away completely from VMware to embrace AHV.
Next we're rolling out ERA! 💪
Badge
I need an Actionplan to upgrade 19 robo clústeres from aos 4.6 to aos 5.5

Hi,

Deploying Nutanix files and setting up.
Hi.
i'm working on IT design like Data center or Data Analytic system.

nice to try Nutanix.
on getting NCP certified
I am working on virtualizing my entire environment. I need to calculate if I need to buy more Nutanix hardware as we speak.
Badge +1
Doing my first community build. I am putting together three older R610 Gen II Dual Processor servers that I bought off of ebay for a pretty good price. No drives, so I ordered a single 500GB 2.5" SAS drive for each, and a single 200GB SSD 2.5" drive for each for hot tier purposes. I also picked up 32GB USB 3 flash drives for the boot/image purposes (At least initially, not sure if I can add a pci-e usb 3.1 card to speed this up, or if I am fine with just the usb dumb down). Just waiting on the 200GB SSD's to arrive today. I have a netgear gigabit 8 port switch, usb drives imaged; reading up on the forums here about using the Perc 6/i to see what caveat's that entails. Thanks to jrack for the help!

Dell PowerEdge R610 Gen II
CPU 2 x Intel Six Core 2.66GHz X5650 6.4GT/s 12MB LGA 1366 80W 64-Bit Processors
RAM 32GB Total; Twelve Slots Available: 8x 4 GB PC3 Memory Installed
Riser Board (2) PCI-Express x8 Gen2 Slots
Power Supply Two 502W Redundant Hot Plug PSU
Incldued Backplane 6x 2.5" SAS/SATA Drive Bays (Starting with 1 x 500GB SAS 2.5" drive and 1 x 200GB 2.5" SAS SSD.
Ethernet TWO Dual Port Embedded Broadcom NetXtreme ll 5709c Gigabit Ethernet NIC
Video Intergrated Matrox G200, 8MB shared video memory
Form Factor 1U Rackmountable
RAID Controller Dell PowerEdge R610 PERC6i RAID Controller Card With Battery Back-Up Remote Access Card iDRAC6 Enterprise Remote Access Card Included
working on keeping our 3 nodes cluster up and running with updates and maintenance
Currently working on gaining my NCP Certification
Badge +5
  1. Getting ideas and preparing for the next Nutanix User Group session in Singapore.
  2. Getting my team members to carry out 1-click upgrade for the hypervisor running on Nutanix. The 1-click upgrade is going to patch the hypervisor as well as the NCC and LCM.
I'm currently preparing for NCP exam. Apart from the online courses any tips on how to learn Nutanix and its features effectively? Thanks!
Upgrading files to 3.5.0.1
Getting ready to upgrade for 5.5.6 to 5.10.
Awaiting the GA of 5.11 so I can check out all the new goodies heading our way
code:
We have 6 nodes and we are thinking about acquiring a seventh given the impressive performance that has
Im working on deploy karbon
Userlevel 1
Badge +2
Upgrading SSD firmware on one of my clusters using LCM.
Badge
Replicating a VM between differnet Hypervisor and backing up this VM from a central cluster.
Desperately trying to leave VMWare and their ridiculous licensing behind and migrate to AHV!
Working on getting started with Beam. Saw a great demo at .NEXT and can wait to start.
Badge +3
Currently on the Pop! Technical Mastery Certification Tour!

Reply