Question

Nutanix Move Performance

  • 9 February 2024
  • 1 reply
  • 39 views

Badge

Hi Everyone,

 

We are currently doing AHV to AHV migration from a DC to another DC. 

I need some tips on maximizing migration performance to ensure the migration can be done in the fastest way as we have limited time.

 

does upgrading CPU/RAM of Move VM do the trick? or is there any settings that can be tweak to increase the performance?

 

Thank you


This topic has been closed for comments

1 reply

Userlevel 5
Badge +6

Hello @badrulnadzri 

The main factor here is the networking, as the long process is in the seeding.