Moving power cords to new PDU | Nutanix Community
Skip to main content

Hi all, I have some NX-1065-G8 & NX-8155-G8 nodes, and I want to move them to new PDUs online. What would be the proper procedure to do this? Should I just disconnect the power cords one by one of a PDU and then reconnect they one by one to the new PDU, check the status after each disconnect and reconnect to make sure the status is normal. And then do the same for the other side of the PDU? Any command or GUI operation is needed, for example, disable the power supply of a node before disconnect? 

Appreciated for any comments. 

I think you can do what your proposal:  disconnect the power cords one by one of a PDU and then reconnect they one by one to the new PDU, check the status after each disconnect and reconnect to make sure the status is normal.