Please involve the Hardware Vendor to confirm if the procedure is possible on the Platform concerned and the configuration is approved before proceeding.
An additional consideration in a mixed cluster is to verify the number of All Flash nodes as there is a minimum requirement.
Procedure:
1. Remove the Node from Cluster using steps mentioned in Prism Web Console Guide.
2. Once Node removal completes, Shutdown the Node.
3. Replace all HDD with SSDs in the node physically.
4. ReImage the Node using Foundation with AOS and Hypervisor Version of the cluster its going to be added to using Field Installation Guide.
5. Once Imaging completes, follow Cluster Expansion procedure using Prism Web Console Guide.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.