Connecting Cloud Innovators: Building Community at .NEXT 2024
Hello, like other post i know if exist an UPS brand to graceful shutdown Nutanix clusters in Vmware enviroment. I've read that about APC, is ti working? https://next.nutanix.com/blog-40/apc-powerchute-network-shutdown-is-certified-nutanix-ready-core-management-operations-19890 Thanks in advance
Hi guys, finally after 6 years I can update our XenApp farm from 6 on win2k8R2 to 7.15 LTSR on Win2k12R2. I've read this good post of how Citrix MCS or PVS can leverage the Nutanix shadow clones: https://next.nutanix.com/t5/Nutanix-Connect-Blog/Citrix-MCS-and-PVS-on-Nutanix-Enhancing-XenDesktop-VM/ba-p/3489 My enviroment is 2 Nutanix cluster on metro availability on 1 vmware stretched cluster. The question is, how MCS can works in this scenario? I need 2 master image, one per Nutanix cluster? Because with only one master image I can't leverage the caching/data locality of the VM in the second cluster and vice versa. Thanks!
Hi all, finally, after a long POC i'm a new Nutanix customer :D I'm waiting N°2 NX-1365S with 6 nodes and the idea is to create a new vsphere cluster version 6 and migrate the existing VM's from the old vsphere 5.5u2. I've just check the Nutanix support page and i see the latest supported version is 6.0u1a build 3.073.146. This version seems to be affected to CBT issue, is it possible to install the correction patch (http://kb.vmware.com/selfservice/microsites/search.do?language=en_US&cmd=displayKC&externalId=2136854) after the the installation? Or install directly the 6.0u1b? Thanks in advance, and have a good w.end!
Hi guys, i'm a potential new Nutanix customer here in Italy ! Actually 43 VM's 6.5TB, 20% CPU average use (6X Xeon 5680 CPU) 400 write/iops average during 24hours and 3000 of peak. The goal is two sites in stretched cluster with sync writes, connected with 2x1Gbs fiber and upgradable to 10Gbs if it is necessary to this project. Actually we have 6 cpu vmware ent. license, 6 cpu Veeam ent.plus license and 6 CPU Microsoft OEM License that i need to rebuy with the new hardware. One key point is the Oracle VM, we've 6 cpu standard one license and Oracle want to license all Vsphere cluster, we discussed with Oracle Italy and with two legals...and that's it! Our partner send me two projects variant: 1) 6 nodes dual socket, 3 per site with 12 Haswell v3 cpu 72 cores in global. 2) 6 nodes single socket, 3 per site with 6 Ivy bridge v2 CPU 60 cores in global. With the number 1 i need to create and buy a dedicated vsphere cluster to run Oracle across 2 of 6 node, I can also use this second cl
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.