+1
We are preparing to migrate about 350TB of data from our existing 3-tier architecture to a Nutanix hybrid solution. Our storage pool is 480TB in size with about 25% SSD before storage efficiency kicks in. We have post-compression turned on as well as cache deduplication. We are going to attempt to migrate 50-100 VM's per night, and we are afraid that we will overrun our SSD tier eventually. Is there a way for me to run a data tiering job, or force the data to destage lower, daily after the migrations are done so that it doesn't impact our future migrations?
Thanks in advance