Hi! I have two doubts related to Collector´s vcpu and cpu calculation.
1) I couldn't find the information on the vcpu/cpu ratio per VM in Collector's Excel spreadsheet? Please, how is it calculated when we perform workload upload per VM?
2) In Sizer, I performed a manual modeling from Collecto´s Excel spreadsheet information as a “Raw Input” and compared it to the automatic per VM-upload modelling.
In the analyzed scenario, the customer has 440 CPU Cores distributed in 19 physical servers/hosts in the current environment (vhost table information)
![](https://uploads-us-west-2.insided.com/nutanix-us/attachment/78cadc37-0eae-471c-84b6-55f20d268745.jpg)
My calculations/modelling for a “Raw Input” is the same for the overall resources calculated by the automatic per VM upload (RAM, Datastore), except for the total o CPU cores in the cluster.
The automatic per-VM upload/calculation was performed with the following settings:
![](https://uploads-us-west-2.insided.com/nutanix-us/attachment/00275a81-3f80-4628-8684-513cab4d9163.png)
As result, the workload was modeled with 552 CPU cores:
![](https://uploads-us-west-2.insided.com/nutanix-us/attachment/4f7467d7-8c52-4703-9e0a-297cd3d5e8f4.png)
Please, why does the per-VM upload have 100 more CPU cores than the existing customer´s environment (552 vs 440 from the current environment)?
This ends up resulting in processors with a higher number of cores than are consumed by the customer´s current VMs/workloads. And it generates a more expensive configuration.
Sincerely,