5 Essential Tips for Maximizing Your Experience at Nutanix .NEXT for Bloggers
I want to install prism central on my cluster, I started downloading the software from my prism element.For more than 48 hours the download is still in progress and I want to abort the download process and resume the installation but I don't see any button allowing me to do this.Can you give me the process to abort the central prism download please?
I configured domain protections between my primary and secondary site.domain protections are configured by VMs which means that I have as many domain protections as VMs.After the first replications, I would like to make sure that the size of my VM on the primary site is identical on the secondary site but I find that this is not the case.I don't know if I'm doing a good interpretation.Attached is the capture of my VM on the primary site before replication and on the secondary after replication.Please help me with your explanations.
I have a cluster of 6 nodes including 3 nodes 1065-G5 and 3 other nodes 1065-G6 which run a hyper-v.I wanted to update from Aos 5.10.5 to 5.17.1 through LCM but I am having issues with the processors.I therefore want to proceed node by node in maintenace mode.Can you give me the procedure for updating the aos by proceeding by this method?
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.